Goodnight, goodnight, construction site
(Book)
At sunset, when their work is done for the day, a crane truck, a cement mixer, and other pieces of construction equipment make their way to their resting places and go to sleep.
Level 3.8, 0.5 Points
Notes
Rinker, S. D., & Lichtenheld, T. (2011). Goodnight, goodnight, construction site. San Francisco, Chronicle Books.
Chicago / Turabian - Author Date Citation (style guide)Rinker, Sherri Duskey and Tom, Lichtenheld. 2011. Goodnight, Goodnight, Construction Site. San Francisco, Chronicle Books.
Chicago / Turabian - Humanities Citation (style guide)Rinker, Sherri Duskey and Tom, Lichtenheld, Goodnight, Goodnight, Construction Site. San Francisco, Chronicle Books, 2011.
MLA Citation (style guide)Rinker, Sherri Duskey. and Tom Lichtenheld. Goodnight, Goodnight, Construction Site. San Francisco, Chronicle Books, 2011.
Record Information
Last Sierra Extract Time | Mar 26, 2024 04:02:34 PM |
---|---|
Last File Modification Time | Mar 26, 2024 04:02:50 PM |
Last Grouped Work Modification Time | May 03, 2024 08:49:34 PM |
MARC Record
LEADER | 02643cam a2200493 a 4500 | ||
---|---|---|---|
005 | 20120405103640.0 | ||
008 | 100625s2011 caua b 000 1 eng | ||
010 | |a 2010025008 | ||
020 | |a 9780811877824 : SAL|c $16.99 | ||
020 | |a 0811877825 : SAL|c $16.99 | ||
035 | |a (Sirsi) i9780811877824 | ||
037 | |b Chronicle Books Llc, C/O Hachette Book Group USA 3 Center Plaza, Boston, MA, USA, 02108|n SAN 200-2205 | ||
040 | |a DLC|b eng|c DLC|d DLC | ||
050 | 0 | 0 | |a PZ8.3.R48123|b Goo 2011 |
082 | 0 | 0 | |a [E]|2 22 |
092 | |a E | ||
100 | 1 | |a Rinker, Sherri Duskey.|0 https://id.loc.gov/authorities/names/n2010049322 | |
245 | 1 | 0 | |a Goodnight, goodnight, construction site /|c Sherri Duskey Rinker and Tom Lichtenheld. |
264 | 1 | |a San Francisco :|b Chronicle Books,|c [2011] | |
264 | 4 | |c ©2011 | |
300 | |a 1 volume (unpaged) :|b color illustrations ;|c 26 cm | ||
336 | |a text|b txt|2 rdacontent | ||
337 | |a unmediated|b n|2 rdamedia | ||
338 | |a volume|b nc|2 rdacarrier | ||
520 | |a At sunset, when their work is done for the day, a crane truck, a cement mixer, and other pieces of construction equipment make their way to their resting places and go to sleep. | ||
650 | 1 | |a Stories in rhyme.|0 https://id.loc.gov/authorities/childrensSubjects/sj2021050017 | |
650 | 1 | |a Construction equipment|0 https://id.loc.gov/authorities/childrensSubjects/sj2021050606|v Fiction.|0 https://id.loc.gov/authorities/childrensSubjects/sj2020050019 | |
650 | 1 | |a Trucks|0 https://id.loc.gov/authorities/childrensSubjects/sj2021050325|v Fiction.|0 https://id.loc.gov/authorities/childrensSubjects/sj2020050019 | |
655 | 7 | |a Fiction.|2 lcgft|0 https://id.loc.gov/authorities/genreForms/gf2014026339 | |
700 | 1 | |a Lichtenheld, Tom,|0 https://id.loc.gov/authorities/names/n99049863|e illustrator. | |
907 | |a .b62227403 | ||
909 | |a Delta Sirsi database number: a97144 | ||
948 | |a MARCIVE Overnight, in 2023.02 | ||
948 | |a MARCIVE Comp, 09/2021 | ||
948 | |a MARCIVE Over, 02/2021 | ||
989 | |1 .i13422081x|b 3325301320949|d dcjef|g -|m |h 40|x 2|t 0|i 5|j 300|k 201210|n 01-09-2024 16:54|o -|a E RINKER | ||
989 | |1 .i134220821|b 3325301320931|d dhjef|g -|m |h 50|x 3|t 1|i 0|j 300|k 201210|n 01-24-2024 20:22|o -|a E RINKER | ||
989 | |1 .i134220833|b 3325301428759|d drjef|g -|m |h 16|x 1|t 0|i 0|j 300|k 201210|n 12-07-2023 22:25|o -|a E RINKER | ||
989 | |1 .i134220845|b 3325301430375|d ddjef|g -|m |h 61|x 5|t 3|i 2|j 300|k 201210|n 03-26-2024 22:00|o -|a E RINKER | ||
995 | |a Loaded with m2btab.ltiac in 2023.02 | ||
995 | |a Loaded with m2btab.ltiac in 2021.09 | ||
995 | |a Loaded with m2btab.ltiac in 2021.02 | ||
995 | |a Loaded with m2btab.migrate 2020.12 | ||
998 | |e -|f eng|a d |