The Library will be CLOSED on Friday, May 10 for a Staff In-Service day.
We will REOPEN on Saturday, May 11 at 9:30 am.

All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm
Public computer use is limited to one 2 hour computer session daily.


Showing 1 - 4 of 4 , query time: 0.01s
Cover Image
Format:
Image
Red Cliff bridge.
Cover Image
Format:
Image
Looking down on the Red Cliff Bridge as the roadbed is being constructed. Lower road into Red Cliff is visible at lower right. Lover's Leap formation is on the left. [Red Cliff Bridge construction photo 11]
Cover Image
Format:
Image
Looking through the arch (under construction) of the Red Cliff Bridge downward to the lower bridge leading into Red Cliff. Railroad tracks visible. Snow on the ground. "Each [arch] rib came in six sections weighing from 17 to 22 tons apiece. The rib sections were hauled by truck from the depot, about a quarter of a mile away, to the highway bridge directly under the high line [of the arch]..." --CHD Bridge Engineer King Burghardt, in Historical...
Cover Image
Format:
Image
Looking up from the arch girders to the support beams of the roadbed in the Red Cliff Bridge. One man is at a girder at the far right; another is standing on the arch right below the roadbed at left. [Red Cliff Bridge construction photo 10]