Showing
21 - 40
of 433
, query time: 0.01s
Format:
Image
Close-up of sand deposits in cut-off trench on the left bank of the river channel.
Format:
Image
Looking upstream from top of embankment at sta. 1+00. The slope at left foreground is ready for riprap. Note shoulder at right where riprap abuts the road ramp constructed by the contractor, which will be left to form a blanket at the left abutment.
Format:
Image
Placing dumped riprap on upstream slope of embankment in vicinity of sta. 33+00. Dragline is being used to grade material to the required slope.
Format:
Image
Looking along upstream slope of dam from station 2+00 toward right abutment . Some hand placing is being done, to bring the riprap to grade. Note stockpile of riprap along crest of dam for use after parapet wall is placed.
Format:
Image
Looking downstream in river section from point on waste pipe on right side of river. End of left half of the permanent cofferdam is seen back of the tripod. Refer to Pine R - 83.
Format:
Image
Looking downstream in river section from point on waste pipe on right side of river. Foundation for a portion of the cofferdam is seen at extreme left.
Format:
Image
Looking toward left abutment from sta. 14+60 in cut-off trench. Excavation for trench across the river is complete and ready for refilling.
Format:
Image
Looking toward right abutment in bottom of cut-off trench from sta. 8+50. Dragline is removing timbers from Test Pit No. 11.
Format:
Image
View of cofferdam looking upstream from a point 115 feet downstream from axis at station 13+00.
Format:
Image
View from opposite station 16+00 looking toward left abutment. The partially excavated secondary cut-off trench is seen in the distance. The primary cut-off trench is in the middle background.
Format:
Image
Looking along the upstream face of the permanent cofferdam toward the right abutment. The trucks and Le Tourneaus are on top of the temporary cofferdam, wasting sand from embankment stripping to fill the spade between the two dams.
Format:
Image
Looking toward left abutment along alignment of secondary cut-off trench from axis station 16+00. The trench has been refilled with compacted embankment in foreground.
Format:
Image
Looking toward left abutment from station 16+50. Placing impervious embankment in old river channel.
Format:
Image
Looking toward left abutment from end of secondary cut-off trench opposite station 16+50, showing embankment placing operations in old river channel.
Format:
Image
Placing the 12-inch diameter sewer-pipe toe drain. The boards were used to gauge the 6 inches of 3/4-inch to 1.5-inch gravel required to be placed about the pipe. The remainder of the trench was filled with small cobbles.
Format:
Image
Material seen in foreground shows the type of material that is being placed in the 18-inch filter blanket at downstream toe of dam. Cobbles are in the cobble-fill section.
Format:
Image
Looking toward right abutment from axis.
Format:
Image
Looking toward right abutment from axis.
Format:
Image
Looking at downstream slope of embankment from a point in the old river channel about 600 ft. downstream from axis. Slope near the crest of the dam has not been graded. Note piezometer well cover at station 11+75 in center of picture.
Format:
Image
View of cut-off trench looking toward left abutment from opposite station 15+50, showing sand deposits being removed. Refer to Pine R - 121.