All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm
Public computer use is limited to one 2 hour computer session daily.


Showing 81 - 93 of 93 , query time: 0.01s
Cover Image
Format:
Image
A compressed air-driven mucking machine at Gilman. The bucket has just been dumped into the ore car behind and is preparing to recover and pick up another load of ore.
Cover Image
Format:
Image
Belden as seen from Gilman. On the left are the loading tippel, steam room and dryer. Loading tippel is extended over the railroad cars to be filled with ore. A surface tram carrying ore ready for loading is visible behind the loading tippel.
Cover Image
Format:
Image
The rod and ball mill. The rod mill is on the left and ball mill on the right. These were used to grind the zinc concentrates for additional chemical processing. Prior to this, the material had chemical agents added to allow the zinc mineral surface to adhere to flotation bubbles. These were some of the steps for making the zinc ready to ship in railroad cars.
Cover Image
Format:
Image
New dryer being put in place at Belden. Drying fins are seen in the inside of the dryer.
Cover Image
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment into the facility.
Cover Image
Format:
Image
Part of the zinc dryer system at the mill in Gilman. The dryer was heated by a firebox under the rotating cylinder. Tumbling action of the dryer coupled with full length fins dried the zinc for loading into rail cars.
Cover Image
Format:
Image
Moving a dryer section into place by blocking and chaining. Small sections pf pipe were also used to move the dryer.
Cover Image
Format:
Image
Section of the zinc dryer being fitted into place at Belden. Chains and blocks are used to move the equipment into the building.
Cover Image
Format:
Image
Joel Fitzgerald, shop foreman, boring a bearing for an electric motor which operates Marcy Mill in the Milling Department.
Cover Image
Format:
Image
Emmet Flaherty preparing to pre-heat two blank pieces of hollow drill steel. In the background is an automatic oil-fired forge which will bring these blanks to an exact temperature for forging. From the hollow drill blanks, finished pieces of lugged steel are formed for use in rock drills.
Cover Image
Format:
Image
Bill Burnett squares up a frame prior to welding it at the Gilman mine. "C" clamps hold the frame in place. A welder's mask and ball peen hammer are to Bill's right. Suction vent hanging at far right.
Cover Image
Format:
Image
Drills and lathes in the repair area. Welders and machinists were employed by New Jersey Zinc to maintain and recycle equipment. During the 1950s, there were three shifts working each day to maintain production levels.
Cover Image
Format:
Image
Conveyor unloading zinc from the dryer at Belden. The zinc was then taken to the loading tippel to be loaded on railcars. Durbin McIlnay is monitoring the process.