All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm
Public computer use is limited to one 2 hour computer session daily.


Showing 41 - 49 of 49 , query time: 0.01s
Cover Image
Format:
Image
Looking through the arch (under construction) of the Red Cliff Bridge downward to the lower bridge leading into Red Cliff. Railroad tracks visible. Snow on the ground. "Each [arch] rib came in six sections weighing from 17 to 22 tons apiece. The rib sections were hauled by truck from the depot, about a quarter of a mile away, to the highway bridge directly under the high line [of the arch]..." --CHD Bridge Engineer King Burghardt, in Historical...
Cover Image
Format:
Image
Lover's Leap rock formation which marks the access to Red Cliff. Hoist on the top of the formation indicates the construction period for the Red Cliff arch bridge on Highway 24 (1938-1939). Railroad tracks in foreground. [Red Cliff Bridge construction photo 2]
Cover Image
Format:
Image
Blasting to create a road to the approach to the new Red Cliff arch bridge. Railroad bridge over the Eagle River visible at right foreground. [Red Cliff Bridge construction photo 5]
Cover Image
Format:
Image
Red Cliff Bridge on U.S. Highway 24, across the canyon of the Eagle River at Red Cliff, Colorado. Completed on July 28, 1941; dedicated and opened to travel on August 3, 1941. Dimensions: 470 ft. long; 209 ft. high; 30-ft. roadway and two 18-inch curbs. The Red Cliff Bridge was entered into the National Register of Historic Places on February 4, 1985, in recognition of its contribution to the heritage of the state of Colorado Buildings in background...
Cover Image
Format:
Image
Red Cliff Bridge at entrance to road into Red Cliff; opened to the public August, 1941 [see notes]. The pulley system at the top of Lovers' Leap used during the construction of the bridge is still visible at top left. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Lover's Leap rock formation as seen from below. Hoist on top of the formation dates it somewhere between 1938 and 1939, just prior to construction of the Red Cliff arch bridge. [Red Cliff Bridge construction photo 3]
Cover Image
Format:
Image
Looking up from the arch girders to the support beams of the roadbed in the Red Cliff Bridge. One man is at a girder at the far right; another is standing on the arch right below the roadbed at left. [Red Cliff Bridge construction photo 10]
Cover Image
Format:
Image
Army Reserve Engineers stand alongside the road with trucks full of supplies and building materials for the Bailey Bridge in Avon, Colorado. Pallets and other materials are on the ground and a frontloader is visible in the background. The Bailey Bridge was constructed in the mid 1960's (1967-1968) by the 244th Company of the 4th Engineer Battalion, United States Army Reserve based at Fort Carson, Colorado. Local men including Claude Gerard and...
Cover Image
Format:
Image
Dan Koprinikar stands with his arms crossed at the completion of the Bailey Bridge in the mid-late 1960s. A man behind him is attaching a sign that reads "This bridge built courtesy of 4th Engineer Battalion Fort Carson Colorado". Koprinikar was an Eagle County Commissioner at the time, as well as Claude Gerard, pictured far left. The Bailey Bridge was constructed in the mid 1960's (1967-1968) by the 244th Company of the 4th Engineer Battalion,...