Looking upstream along centerline of outlet channel. Picture taken at 11:45 AM, a few minutes before water flowed over weir wall. Standing on temporary bulkhead from left to right - C. A. Burns, H. F. Bahmeier, and F. F. Smith.
Looking downstream along centerline of outlet channel from a point on downstream slope of embankment. Pump houses on each side are for contractor's water supply. Refer to Pine R - 233
Excavation at right side of spillway near sta. 7+00. Le Tourneau is removing material which has been bladed off of slope with motor-grader seen in Pine R - 268.
Looking upstream in spillway channel from right side at sta. 28+90. The vertical curve is approaching grade and at the bottom of the stilling basin in foreground is about 6 feet above grade. Shovel is excavating for right wing wall.
Looking downstream in spillway channel from sta. 7+00. Le tourneau in foreground is excavating material upstream from sta. 15+00. Placing of concrete walls can be seen below station 15+00.
Looking downstream in spillway channel from a point on right side of spillway at sta. 7+00. Note reinforcement and forms in place for walls downstream from outlet channel.