All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm
Public computer use is limited to one 2 hour computer session daily.

Archive Search Results


Showing 1 - 15 of 15 , query time: 0.02s

1. Convoy

Thumbnail for 'Convoy'
Format:
Image
Truck convoy negotiating the Old Battle Mountain Road. The original rock supported roadway is clearly visible [Title supplied from catalog prepared by the Eagle County Historical Society.]
Thumbnail for 'Tennessee Pass'
Format:
Image
Photo postcard of U.S. Hwy 24 at the top of Tennessee Pass (Alt. 10,240 ft,) between Leadville and Red Cliff, Colorado. [Sanborn W-1181] There is snow on the ground.
Thumbnail for 'Battle Mountain before Red Cliff Bridge'
Format:
Image
Road to Red Cliff with old bridge across the Eagle River before the Red Cliff Bridge was opened in 1941. Battle Mountain is on the left. Photograph is labeled: "Roads end" [Title supplied from catalog prepared by the Eagle County Historical Society.]
Thumbnail for 'Battle Mountain Highway'
Format:
Image
Photo postcard showing the "New Battle Mountain Highway," U.S. Hwy 24. The view is looking south, going from GIlman to Red Cliff.

5. Convoy

Thumbnail for 'Convoy'
Format:
Image
Truck convoy negotiating the Old Battle Mountain Road. The original rock supported roadway is clearly visible. Probably the original image from which the close-up [1984.001.018] was made. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Thumbnail for 'Overpass leading to Red Cliff'
Format:
Image
Railroad overpass on Colorado Highway 24 leading to Red Cliff. This was the route to Red Cliff prior to the construction of the Red Cliff arch bridge. [Red Cliff Bridge Construction photo 1]
Thumbnail for 'Red Cliff Bridge'
Format:
Image
Photo postcard showing the Red Cliff Bridge, opened in 1941. A Denver & Rio Grande train is coming from Red Cliff, headed toward Gilman, alongside the very clear Eagle River. At the left is the Lover's Leap cliffs. On the right is the cut in the lower rocks for the road down to Red Cliff. At the center of the photo above the bridge can be seen the tailings from Hornsilver Mine with Butter Flats (clearing) just above that.
Thumbnail for 'Gold Park Rd. at Homestake Creek'
Format:
Image
County road maintainer caught in trees above Homestake Creek on the Gold Park Road. Dempsey Perkins (county man in Red Cliff who plowed snow) and Buster Beck were plowing the Gold Park Road for the second day in the Winter of 1952. Something went wrong with the maintainer and it went off the road and over the hill with both men in it. The maintainer hung up on a tree and didn't drop into Homestake Creek. Both men made it out with minor injuries....
Thumbnail for 'Gold Park Rd. at Homestake Creek'
Format:
Image
County road maintainer caught in trees above Homestake Creek on the Gold Park Road. Dempsey Perkins (county man in Red Cliff who plowed snow) and Buster Beck were plowing the Gold Park Road for the second day in the Winter of 1952. Something went wrong with the maintainer and it went off the road and over the hill with both men in it. The maintainer hung up on a tree and didn't drop into Homestake Creek. Both men made it out with minor injuries....
Thumbnail for 'Approach to the Red Cliff Bridge'
Format:
Image
Building the approach to the new Red Cliff arch bridge (Highway 24). Digging equipment at far right midfield in the photo. [Red Cliff bridge construction photo 4]
Thumbnail for 'Red Cliff Bridge'
Format:
Image
Roadbed construction on the Red Cliff Bridge, silver in color. Lover's Leap is on the right. [Red Cliff Bridge construction photo 12]
Thumbnail for 'Road into Red Cliff'
Format:
Image
Road into Red Cliff, prior to the construction of the Red Cliff Bridge on Hwy 24 (prior to 1941).
Thumbnail for 'Red Cliff arch bridge'
Format:
Image
Red Cliff Bridge on U.S. Highway 24, across the canyon of the Eagle River at Red Cliff, Colorado. Completed on July 28, 1941; dedicated and opened to travel on August 3, 1941. Dimensions: 470 ft. long; 209 ft. high; 30-ft. roadway and two 18-inch curbs. The Red Cliff Bridge was entered into the National Register of Historic Places on February 4, 1985, in recognition of its contribution to the heritage of the state of Colorado Buildings in background...
Thumbnail for 'Red Cliff Bridge'
Format:
Image
Red Cliff Bridge at entrance to road into Red Cliff; opened to the public August, 1941 [see notes]. The pulley system at the top of Lovers' Leap used during the construction of the bridge is still visible at top left. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Thumbnail for 'Battle Mountain Road, Red Cliff, Colo.'
Format:
Image
"BATTLE MOUNTAIN is the most striking section of the Pikes Peak Ocean to Ocean Highway between Tennessee Pass and Glenwood Springs. After the town drops down into the picturesque town of Red Cliff, hidden in the valley of the Eagle River, it cuts its way spectacularly along a great series of sheer, pointed, out-jutting white faced cliffs, gradually rising until it travels along the top of the great Eagle River Cañon far below."