All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm Public computer use is limited to one 2 hour computer session daily.
Rail cars knocked off the tracks in the winter, circa 1951-52 at Belden. Other cars are lined up in the background awating loading. The dryer is the large building behind the railroad cars.
A surface tram used to move ore and equipment is on the left coming into Belden from Gilman at the top. Loading tippel, steam room and the dryer buildings are pictured in the lower right.
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment
into the facility.