All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm
Public computer use is limited to one 2 hour computer session daily.

Archive Search Results


Showing 1 - 4 of 4 , query time: 0.01s
Thumbnail for 'Mill and tram at Belden'
Format:
Image
The Belden mill and tram in Eagle Canyon, below Gilman. Railroad tracks at bottom right in photo. Taken after the 1919 landslide.
Thumbnail for 'Box cars after landslide'
Format:
Image
Box cars moved off D&RG tracks at Belden after the 1919 landslide.
Thumbnail for 'Surface tram to Belden'
Format:
Image
A surface tram used to move ore and equipment is on the left coming into Belden from Gilman at the top. Loading tippel, steam room and the dryer buildings are pictured in the lower right.
Thumbnail for 'Eagle Lumber Co. loading shed'
Format:
Image
The Eagle Lumber Co. loading shed for the Denver & Rio Grand railroad at Peterson Creek gulch in the Eagle River Canyon (about .5 mi. from Red Cliff and 2 mi. from Belden). The logs were sent down on the surface tram running down the gulch in this photo and then loaded on train cars. There is another set of main line tracks across the Eagle River (at the bottom of the photo). The small building at the right is the tram house. Above that, there...