Thumbnail for 'Rock excavation for concrete cut-off wall footing (2)'
Format:
Image
Rock excavation for cut-off wall footing looking toward left abutment from point opposite axis at station 3+00.
Thumbnail for 'Upper drainage system sump'
Format:
Image
Looking toward right abutment from axis station 7+75 showing sump for upper drainage system seen in Pine R - 174.
Thumbnail for 'Installation of foundation drainage system'
Format:
Image
Installation of foundation drainage system on upper bench at upstream side of cut-off trench, left abutment.
Thumbnail for 'Showing mechanical tamping of embankment'
Format:
Image
Looking toward right abutment in cut-off trench, showing mechanical tamping of embankment over foundation drainage system.
Thumbnail for 'View of left abutment along cut-off trench centerline (2)'
Format:
Image
Looking along center line of cut-off trench toward left abutment from opposite dam axis station 8+00. Note rock excavation for cut-off wall footing in center.
Thumbnail for 'Concrete cut-off wall on left abutment'
Format:
Image
Concrete cut-off wall on left abutment. Portion of cut-off trench in foreground has been refilled, covering the wall. Refer to Pine R - 160.
Thumbnail for 'Placing concrete for cut-off wall footings at left abutment (2)'
Format:
Image
Placing concrete for cut-off wall footings at left abutment.
Thumbnail for 'View of foundation drainage installation and left abutment'
Format:
Image
Looking toward left abutment from axis station 7+75 showing in foreground the installation of foundation drainage system at upstream side of cutoff trench. This installation is on the bench shown in upper left hand corner of Pine R - 157.
Thumbnail for 'View of left abutment from bottom of cut-off trench (4)'
Format:
Image
Same view as Pine R - 158 after approximately 30 feet of embankment has been placed. Note grout risers and top of c.m.p. sump.
Thumbnail for 'Excavation of additional cut-off trench (1)'
Format:
Image
Looking toward right abutment from axis sta. 7+75. Le Tourneaus are seen excavating additional cut-off trench in center of picture, and placing the material directly into the fill in the old river channel in the foreground.
Thumbnail for 'Excavation of additional cut-off trench (3)'
Format:
Image
Excavating additional cut-off trench. Looking toward left abutment from axis at sta. 20+00. Refer to Pine R - 167 and 171.
Thumbnail for 'Excavation of additional cut-off trench (2)'
Format:
Image
Looking toward left abutment from sta. 20+00. Additional cut-off trench excavation in foreground. Refer to Pine R - 167.
Thumbnail for 'Placing embankment in old river channel'
Format:
Image
Embankment placing in old river channel, where operations are being concentrated at present. The No. 3 section is seen in foreground grading into the downstream No. 2 section near rock-rake and trucks.
Thumbnail for 'Placing embankment in additional cut-off trench (2)'
Format:
Image
Placing embankment in additional cut-off trench. Looking toward right abutment from axis sta. 16+25. Refer to Pine R - 188 and 195.
Thumbnail for 'Inlet channel to outlet conduit'
Format:
Image
Inlet channel to outlet conduit, looking downstream. Structure seen in center is the concrete mixing plant.
Thumbnail for 'Excavating in bedrock'
Format:
Image
Excavating in bedrock at upstream right hand corner of trashrack structure.
Thumbnail for 'Excavating rock for trashrack foundation'
Format:
Image
Excavating rock for foundation for the trashrack structure.
Thumbnail for 'Looking downstream in outlet conduit (6)'
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. The conduit is being covered with 3 feet of loose earth to protect it from freezing. The earth is being placed by the contractor and will be removed in the spring, at his own expense. Refer to Pine R - 97.
Thumbnail for 'Looking downstream in outlet conduit (7)'
Format:
Image
Looking downstream in outlet conduit from station 6+75. Note backfilling operations. Refer to Pine R_ 61, 69, 74, 88, 97, 107, & 124.
Thumbnail for 'View of left abutment along cut-off trench'
Format:
Image
Looking along center-line of cut-off trench toward left abutment, from a point opposite sta. 27+50. The location and angel of view is approximately the same as to Pine R - 32, 39, and 55.