All accounts now require passwords. Please click HERE for more details.
Library Hours: Monday-Thursday 9:30am-7:30pm, Friday-Saturday 9:30am-5:00pm and Sunday 12pm-5pm
Public computer use is limited to one 2 hour computer session daily.

Archive Search Results


Showing 21 - 26 of 26 , query time: 0.01s
Thumbnail for 'New dryer placement'
Format:
Image
New dryer being put in place at Belden. Drying fins are seen in the inside of the dryer.
Thumbnail for 'Zinc dryer from railroad car to dryer building'
Format:
Image
Moving the zinc dryer from a railroad car into the dryer building at Belden. A wall section approximately 60 feet long has been removed in the dryer building to move this equipment into the facility.
Thumbnail for 'Moving a dryer section'
Format:
Image
Moving a dryer section into place by blocking and chaining. Small sections pf pipe were also used to move the dryer.
Thumbnail for 'Moving the zinc dryer'
Format:
Image
Section of the zinc dryer being fitted into place at Belden. Chains and blocks are used to move the equipment into the building.
Thumbnail for 'Drills and lathes'
Format:
Image
Drills and lathes in the repair area. Welders and machinists were employed by New Jersey Zinc to maintain and recycle equipment. During the 1950s, there were three shifts working each day to maintain production levels.
Thumbnail for 'Unloading zinc from dryer'
Format:
Image
Conveyor unloading zinc from the dryer at Belden. The zinc was then taken to the loading tippel to be loaded on railcars. Durbin McIlnay is monitoring the process.